Perimeter facade wall
- walled with brick blocks, reinforced concrete locally
- complete mineral wool thermal insulation system, meeting recommended (not just required) norms for thermal insulation
Inter-apartment walls
- reinforced concrete walls, meeting required norms for acoustic and heat insulation
Apartment-internal walls
- walled with kiln bricks, gas silicate installation walls
Internal wall and ceiling surfaces
- brick walls – core plaster with stucco surface
- reinforced concrete ceilings and walls – thermal insulation system with fine plaster finish
- abrasion-resistant paint
Windows, balcony doors
- wooden Europrofile windows, full-perimeter fittings
- balcony doors: tilting, sliding (for large apartments and terraces), or turning (for small apartments and balconies)
- insulating double glass, min. U = 1.2 W/m²K
- inner window sills in the colour shade of the window frame
Entrance door
- solid-wood security door, 3rd security class
- fire resistant EIEW 30-D3, soundproof 37dB
- steel security door frame, 7 security points
- ready for electronic security signalling
Interior doors
- solid, wooden, veneered, turning or sliding
- manufactured by Sapeli, model Elegant, oak, beech, mahogany or ash veneer
- fully glazed in the living room
- fittings – split rosette, matte stainless
Floors
- dwelling rooms, halls – three-layer wooden floor
- bathrooms, WC – tile
- see the Bathroom Catalogue for detailed tile specifications
- terraces, balconies – Taurus tile
Wall tiling
- bathrooms, WC up to a height of 2100 mm
- see the Bathroom Catalogue for detailed wall tile specifications
Surfaces
- brick walls – core plaster with stucco surface
- reinforced concrete ceilings and walls – fine plaster
- abrasion-resistant white paint
Bathroom appliances
- HANSGROHE water fixtures
- LAUFEN Pro A sanitary ceramics
- hanging toilet and bidet
- KALDEWAI bathtubs
- RIHO, HŰPPE showers, poured marble shower basins
- see the Bathroom Catalogue for detailed specifications
Heating and hot water
- slab radiators with thermostatic valves, in the bathroom tube radiators (ladders) with thermostatic valves
- heat convectors with thermostatic valves for glazed walls with low sills
Electrical wiring
- home telephone, telephone, internet, installation-ready for cable and satellite TV, autonomous smoke detectors, ready for electronic security system
- TV and telephone outlets in every dwelling room
- extra high-voltage outlets
- switches and outlets ABB type Time and Element
Kitchen cabinets and facilities
not provided, installation-ready within the standard design
STANDARDS FOR THE BUILDING AND COMMON AREAS
Structural design
- bored pile and pad foundation
- load-bearing structure combined, monolithic, reinforced concrete
- in the lower storeys a skeletal system with columns and underground walls, in the higher storeys a wall system
- reinforced concrete ceilings
- reinforced concrete, pre-fabricated stair casing
Lifts
- 2 independent lifts, one of which is for evacuation
- accessible from all building storeys, including underground storeys
Floors
- common areas Taurus tile including plinth with required anti-skid properties
- three-level cleaning area at the building entrance
Wall and ceiling surfaces
- brick walls – core plaster with stucco surface
- reinforced concrete ceilings and walls – thermal insulation system with fine plaster finish
- abrasion-resistant paint in colour combinations
Metalwork
- steel varnished staircase banisters
- outdoor galvanised steel handrails and banisters
Common garages
- garage entrance gate
- comprehensive light signalling system
- camera security system
Electrical systems
- lighting of common areas controlled by motion sensors
- emergency lighting throughout the building
- perfect building protection with an LPS class 3 lightning rod
- separate measuring for garages, cellars and the heat exchange station
Heating
- central heating provided by an exchange station connected to the Pražská teplárenská a.s. network
Air handling
- option to install a kitchen ventilation hood performing at up to 350 m3/h
- aeration of the large garages in the 1st and 2nd underground storeys through forced ventilation on the building’s roof
- garage ventilation triggered by motion sensors and CO detectors
- aeration of the rubbish room through forced ventilation on the building’s roof